FM glossary.
The facilities management terms that come up most, in plain English.
6 min read · Updated 29 September 2026
- Asset register
- A list of every piece of equipment you maintain, where it is, and its history.
- CAFM
- Computer-aided facilities management. Software for running the maintenance of buildings.
- Certificate
- Written proof that an inspection or test was done, and what it found.
- CMMS
- Computerised maintenance management system. Software focused on maintaining assets.
- EICR
- Electrical installation condition report. A periodic inspection of fixed wiring.
- F-gas
- Fluorinated gases used in air conditioning and refrigeration, with their own leak-check rules.
- FSM
- Field service management. Software for scheduling and running engineers.
- Golden thread
- The accurate, up-to-date record of a higher-risk building, required under the Building Safety Act.
- Helpdesk
- The team, or system, that takes in faults and requests and turns them into jobs.
- Intake
- How work arrives: email, phone, portal. docket gives each company its own intake address.
- Job sheet
- The record an engineer fills in to show what was done on a job.
- KPI
- Key performance indicator. A measure of how well the work is going.
- Legionella
- Bacteria that can grow in water systems. Controlled through risk assessment and monitoring.
- LOLER
- Lifting Operations and Lifting Equipment Regulations 1998. Covers lifts and hoists.
- Out of hours
- Work reported or done outside normal working hours, usually emergencies.
- PO
- Purchase order. The approval to spend money with a supplier or subcontractor.
- PPM
- Planned preventive maintenance. Recurring tasks done on a schedule.
- Reactive maintenance
- Fixing things when they break or are reported.
- Remedial
- Follow-on work found during a job or inspection that still needs doing.
- Site
- A building or location you maintain.
- SLA
- Service level agreement. How quickly jobs must be responded to and fixed.
- Subcontractor
- A company you send work to, rather than doing it with your own engineers.
- TM44
- An energy inspection of air conditioning systems over 12kW, every five years.
- Work order
- An instruction to carry out a piece of work. Often another word for a job.
Straight answers.
What is PPM in facilities management?
Planned preventive maintenance: recurring tasks done on a schedule to stop things breaking.
What is a remedial?
Follow-on work found during a job or inspection that still needs doing.
Keep reading
Put it into practice.
A call on Teams. We set you up, free. The 60 days come first, with no commitment.
Book a demo